The Narranon Viaduct Project is located in the heart of Bangkok, Thailand, and is a crucial road improvement initiative for improving traffic conditions on RAMAIII and Ratchadapisek roads. The project encompasses an elevated main artery and three supplementary viaducts, with the main artery length being 1.88 kilometers and the auxiliary length being 1.45 kilometers collectively.
Boyoun has successfully developed the BY1507 automated segmental box grider precast system by conducting a comprehensive analysis and validation of both domestic and international segment assembly technology, along with its experience in the design, production, and construction of bridge formwork in the past, following the BY1203 and BY1306 models. This technology has a small footprint, is simple to operate, and is more adaptable to the terrain of clients worldwide.
Boyoun provided multiple segmental box griders for this particular project. Despite the challenges posed by the COVID-19 pandemic, Boyoun overcame a range of technical and unforeseen issues and successfully completed all segment box griders within the predefined timeframe, ensuring the overall progress of the project's construction.
International Department: Room 2211-2212, Tower C of Wanda Plaza, Tongzhou District, Beijing 101118, China.
+86-13021287080
info@boyoun.cn