8618513399356

Cantilever Form Traveler Cases

Xingyang Yellow River Bridge Cast in Situ Beam Cantilever Form Traveler Boyoun

Description

Project name: Xingyang Yellow River Bridge

Project Introdction: The bridge is 10,796 meters long and follows a first-class road standard with six lanes for two-way traffic. The main bridge spans 3,800 meters, with a design of 5x(80+5x120+80) meters. It was completed and opened for traffic in 2019.

Equipment provided by Boyoun: Balanced Cantilever Traveller   


Gallery
  • Xingyang Yellow River Bridge Cast in Situ Beam Cantilever Form Traveler Boyoun
  • Xingyang Yellow River Bridge Cast in Situ Beam Cantilever Form Traveler Boyoun
  • Xingyang Yellow River Bridge Cast in Situ Beam Cantilever Form Traveler Boyoun
Products Used

Successful Cases

Get In Touch

International Department: Room 2211-2212, Tower C of Wanda Plaza, Tongzhou District, Beijing 101118, China.

+86-13021287080

info@boyoun.cn

© Copyright 2020 Shandong Boyoun Heavy Industries Co., LTD. Design by BontopBlog