Products used: Tunnel Lining Trolley
Construction unit: OTA Tunnel Squad Sdn. Bhd.
Project Features: The north-south "artery" of the rail transit network in Kuala Lumpur and its surrounding areas connects 2 million residents along the line into a "half-hour living circle"
The Kuala Lumpur MRT Subway Line 2 in Malaysia is an integral part of Kuala Lumpur's mass rapid transit rail transit. Line 2 has a total length of 52.2km, including 13.5km of tunnels and 11 underground stations, 38.7km of elevated lines and 26 elevated stations, and 1 depot.
The project adopts a design-construction-procurement contract model. The scope of the project includes design, procurement, construction, commissioning and trial operation. The work content includes the entire line of tracks, conductor rails, engineering and maintenance vehicle procurement, etc.
For this project, Boyoun provided multiple sets of tunnel lining trolleys, which were pre-assembled, shot blasted, and rust removed, and painted before leaving the factory to ensure product quality and the smooth construction of the project.
International Department: Room 2211-2212, Tower C of Wanda Plaza, Tongzhou District, Beijing 101118, China.
+86-13021287080
info@boyoun.cn