The Pak Lay Mekong River Bridge is located in the middle reaches of the Mekong River in Laos. This is a crucial bridge across the Mekong River on the access road to the Pak Lay Hydropower Station. It is also the only passage that connects the two banks during the construction and operation period of the hydropower station. The bridge is 567 meters long and features a (88+2x160+103+45) meter continuous rigid frame and cantilever form traveler casting construction.

Pak Lay Mekong River Bridge Cantilever Form Traveler Construction Site

Pak Lay Mekong River Bridge Cantilever Form Traveler Construction Site

Boyoun has provided four sets of cantilever form travelers for the Mekong River Bridge project. The first set of cantilever form traveler completed the preloading on May 12th, and the final capping pouring of the pier table of pier column 2 was completed on May 13. 

At present, the adjustment of the bottom form elevation of the form traveler of pier column  1 has been completed, and the other three sets of form travelers have been stored separately according to the pier number. 

Boyoun places great importance on this project in response. Boyoun service engineers monitor all aspects of the process in real-time. They also provide on-site guidance on critical links such as assembly and disassembly of form travelers to reduce costs, increase efficiency in construction management, and ensure the safety of construction operations.

Picture of Loading Form Travlers in the Factory

Picture of Loading Form Travelers in the Factory

After nearly two decades of development, the company's products have been serving in 15 countries or regions in Southeast Asia, South Asia, East Asia, Africa, Central and South America. We have successfully completed over 1200 projects such as the China-Maldives Friendship Bridge in the Maldives, the Padma Bridge in Bangladesh, and the China-Laos Railway, covering various product series such as continuous beam cantilever form traveler, stay cable form traveler, segmental assembly equipment, precast box girder equipment, tunnel construction equipment, and intelligent construction equipment.

Quality supplier of road and bridgeconstruction equipment

Quality Supplier of Road and Bridge Construction Equipment Award

The smooth construction of the Pak Lay Mekong River Bridge project in Laos has added another impressive "Boyoun mark" to the company's overseas achievements. In the future, Boyoun will continue to expand its overseas business and closely follow the national "One Belt, One Road" policy. We will win the trust of customers with our advanced technology, top-notch quality, value-added services, and efficient and professional technical support. We strive to become the world's reliable supplier of infrastructure industry.

Gallery
  • Laos Mekong River Bridge Project
  • Laos Mekong River Bridge Project
  • Laos Mekong River Bridge Project
Products Used
Get In Touch

International Department: Room 2211-2212, Tower C of Wanda Plaza, Tongzhou District, Beijing 101118, China.

+86-13021287080

info@boyoun.cn

© Copyright 2020 Shandong Boyoun Heavy Industries Co., LTD. Design by BontopBlog