8618513399356

Form Traveler Cases

North Riverside High-speed Railway Project

Description

The continuous beam across S229 in Taixing, North riverside high-speed railway package 9, is located in Taizhou City, Jiangsu Province.

It adopts a prestressed concrete continuous beam with a span of 72+128+72m and a single-cell box structure, which is constructed by suspension casting with cantilever form travelers and bridge fabrication machines.

Boyoun supplied a total of 968 tons of construction materials for the entire package,which were applied to continuous beams with various spans, such as 128m, 100m, and 48m. Currently, some of the continuous beams have been closed.

Boyoun's professional and continuous on-site services have ensured the smooth construction of the project.Boyoun was highly recognized and received a commendation letter commending the professional performance of the on-site service personnel.

The North Riverside High-Speed Railway is a crucial component of the main Riverside High-Speed Railway channel of the national "Eight Vertical and Eight Horizontal" high-speed railway network.It is the first national trunk high-speed railway passing through Taixing.

Upon completion and opening, the travel time from Taixing to Shanghai will be reduced to within an hour.

It is of great significance for optimizing Taixing's traffic layout and promoting regional economic development.

 

 

 


Gallery
  • North Riverside High-speed Railway Project
  • North Riverside High-speed Railway Project
  • North Riverside High-speed Railway Project
Products Used
Get In Touch

International Department: Room 2211-2212, Tower C of Wanda Plaza, Tongzhou District, Beijing 101118, China.

+86-13021287080

info@boyoun.cn

© Copyright 2020 Shandong Boyoun Heavy Industries Co., LTD. Design by BontopBlog