The Xiguan Street West Extension project is a crucial urban construction project in Liaocheng City, with a total investment of 1.95 billion yuan. The project starts at Changrun Road in the east and ends at Xihuan Road in the west. The road is 5.4 km long and has six lanes in both directions. It is the main road that connects the main city and the new high-speed rail area.
Xiguan Street West Extension Project
The 12th span of the South-to-North Water Diversion Channel Bridge is a prestressed concrete cable-stayed bridge with a full width of 56.4m and a span layout of (96+60+30)m. The 96m main span spans the river section using a single-box five-cell cantilever form traveler for suspended pouring construction. The tying of steel bars, formwork erection, concrete pouring, and prestressing are all performed on the form traveler.
To ensure the smooth construction of the form traveller and save the customer's construction time, Boyoun has hired professional engineers to provide tracking and technical support. An on-site inspection and guidance on key links, such as assembly and walking , will ensure the normal operation of the equipment.
Boyoun has over 30 after-sales engineers, serving over 1,000 projects, dedicated tracking, pre-training, on-site guidance on key links, full technical support, real-time connection, quick response, fast closed loop, focusing on customer needs and saving construction time for customers.
Upon completion of the Xiguan Street West Extension Project, it will become a crucial trunk road in the Liaocheng High-speed Railway New Area. This will not only improve the area's external transportation network, but also encourage the gathering of more resources into the High-speed Railway New Area , which will lay a strong foundation for future development.